The Manager of BESS Standard Solutions is responsible for leading a multidisciplinary engineering team to develop, optimize, and maintain standardized battery energy storage system (BESS) power block solutions. This role focuses on creating technically sound, commercially competitive, and execution-ready standard configurations built around LGES ESS products, paired with appropriately specified power conversion systems (PCS) and medium-voltage transformers (MVT). The outputs of this team directly enable our Sales teams to efficiently bid projects using pre-engineered, well-documented solutions, while also supporting downstream execution teams post-contract. This role reports to the Director of Project and Applications Engineering. This role will work out of LGES Vertech’s Westborough, MA office.